Baptist-Small-Feature-Baptist

 

Baptist Health Cancer Institute

The Miami Cancer Institute is a cancer treatment center that consists of a 5 story, 352,000 sf clinical cancer center, a five story 94,000 sf research facility, a six barrel linear accelerator and a 15,000 sf central energy plant. A precast joist and soffit beam system is utilized at all elevated slabs for the cancer building, research facility and the central energy plant.  The cancer building and the research facility feature an architectural sloping roof that partially cantilevers over 80’-0” to the ground level below.

The project also includes South Florida’s first Proton Therapy building, one of only a few in the nation.  The Proton Therapy building is has over 15,000 cy of concrete and is made up of mass concrete walls and slabs, some of which are over 10’-0” thick.

For more information on Baptist Health Cancer Institute, Click Here

 

Lake Nona Dual Brand Hotel

 

Lake Nona Town Center and Garage

The Lake Nona Town Center project included a 7-story hotel and a 5-story parking garage.
The hotel structure has 8” post-tensioned flat slabs with transfer beams at the 2nd level. The typical floor was 17,000 sf divided into two pours. Utilizing column hung tables for this structure we were able to achieve an 8 day cycle from the 3 floor through the roof. The structure was completed in November 2014.

The parking garage design consisted of post tensioned beams and slabs. The garage was 175,000 sf with an additional 25,000 sf of speed ramps. We completed the garage in April 2015.

For more information on Lake Nona Town Center and Garage, Click Here

 

Moffitt-McKinley-Small2.jpg

 

Moffitt McKinley Outpatient Facility & Ambulatory Surgery Center

Moffit Mckinley Outpatient Treatment is a 6 story, 245,000 SF hospital in Tampa, Florida. Typical elevated slabs are 10” slabs with drop panels. Universe Forming performed a full concrete package on this project, including all forming and shoring, placement of reinforcing and concrete.

For more information on Moffitt McKinley Outpatient Treatment, Click Here

 

The Plaza On University

Universal Forming provided a Turnkey Concrete Package for this student housing project which included foundations, columns, & retaining walls for five residential structures and a precast parking structure. The project had over 90,000 SF of elevated, post-tensioned slabs and 13,000 cubic yards of concrete. Universal Forming, Inc. completed over 80% of this project in less than four months.

Universal Forming, Inc., Has built a solid reputation for providing concrete construction services with a particular focus on delivering a quality project on time or ahead of schedule without sacrificing safety. We offer our customers a flexible scope of work from a formwork-only scope to a complete turn-key concrete structure. We also assist and/or provide our customers with project scheduling and site logistics planning.

For more information on Plaza on University, Click Here

The Plaza On University concrete foundations, columns, & retaining walls for five residential structures and a precast parking structure.

FEATURE PROJECTS

Click one of Universal Forming’s Feature Project Icons to view full scope of project.

 

Universal Forming

Universal Forming, Inc., Has built a solid reputation for providing concrete construction services with a particular focus on delivering a quality project on time or ahead of schedule without sacrificing safety. We offer our customers a flexible scope of work from a formwork-only scope to a complete turn-key concrete structure. We also assist and/or provide our customers with project scheduling and site logistics planning.

 

Contacting Universal Forming

2461 West State Road 426 Suite 1041 Oviedo, FL 32765
• Phone: 407.977.0477
• Fax: 407.977.0479 

Visit our Contact page for more information